32,070
edits
ClassicTEK (talk | contribs) No edit summary |
No edit summary |
||
Line 9: | Line 9: | ||
The scope was then given a rough check for proper operation and put in a special room to cycle until the next day where it would be calibrated, sent to QC and then shipped. The DIRECT position | The scope was then given a rough check for proper operation and put in a special room to cycle until the next day where it would be calibrated, sent to QC and then shipped. The DIRECT position | ||
was used in the cal procedure to check the power supply regulation from low to high line. | was used in the cal procedure to check the power supply regulation from low to high line. | ||
The TU-75B is similar to the [[75A]]. | |||
<gallery> | <gallery> |