Tek Engineering Circa 1962-1964: Difference between revisions

no edit summary
(Created page with "All of instrument design from July 1951 until March 1966 was in Building 81 The location of personnel in this document is primarily in the productive years of 1963 and 1...")
 
No edit summary
Line 220: Line 220:
[[Marlow Butler]] The front bay, was Mechanical Design
[[Marlow Butler]] The front bay, was Mechanical Design


Maurie Merrick-Accessories and Camera Development
[[Maurie Merrick]] - Accessories and Camera Development


Sid Broughton
[[Sid Broughton]]


Norm Hughes
[[Norm Hughes]]


Len McCracken
[[Len McCracken]]


Jamie Navia
[[Jamie Navia]]


Martha Rowland
[[Martha Rowland]]


Denny Smith
[[Denny Smith]]


Dwaine Romine
[[Dwaine Romine]]


Frank Axford
[[Frank Axford]]


Jerry Moshofsky
[[Jerry Moshofsky]]


Alex Padilla
[[Alex Padilla]]


Bob Richardson
[[Bob Richardson]]


Don Smith
[[Don Smith]]


Jay Chido-Mechanical Instrument Design
[[Jay Chido]] - Mechanical Instrument Design


Bud Deibele, Project Engineer
[[Bud Deibele]], Project Engineer


Chuck Brown
[[Chuck Brown]]


Ross Gifford
[[Ross Gifford]]


Al Robinson
[[Al Robinson]]


Bill Root
[[Bill Root]]


Bob Shand
[[Bob Shand]]


Dick Sollars
[[Dick Sollars]]


Frank Maniatis, Project Engineer
[[Frank Maniatis]], Project Engineer


Bill Cottingham
[[Bill Cottingham]]


Dave DeMuth
[[Dave DeMuth]]


John Reichen
[[John Reichen]]


Leighton Whitsett
[[Leighton Whitsett]]


Archie Yergen
[[Archie Yergen]]


Leon Prentice, Project Engineer
[[Leon Prentice]], Project Engineer


Henry Bahrs-front panels                                   
[[Henry Bahrs]] - front panels                                   


Dave Morin
[[Dave Morin]]


Glenn Powers
[[Glenn Powers]]


Don Thorneycroft
[[Don Thorneycroft]]


Dick Swanson, Project Engineer
[[Dick Swanson]], Project Engineer


Paul Clark
[[Paul Clark]]


Dave Curtis
[[Dave Curtis]]


Dick Duggan
[[Dick Duggan]]


Virgil Gray
[[Virgil Gray]]


Larry McCoy
[[Larry McCoy]]


Eldon Hoffman
[[Eldon Hoffman]]


Bob White
[[Bob White]]


Hillis Heath
[[Hillis Heath]]


Bill Strong
[[Bill Strong]]


Bill Pickering
[[Bill Pickering]]


Clyde Feitush
[[Clyde Feitush]]


Dick Hansen
[[Dick Hansen]]


Gail Morris-Industrial Design
[[Gail Morris]] - Industrial Design


Dick Edstrom
[[Dick Edstrom]]


Al Hill
[[Al Hill]]


Bob Metcalf
[[Bob Metcalf]]


Jack Nelson
[[Jack Nelson]]




That may have brought us back to the front of the building.
That may have brought us back to the front of the building.
Line 327: Line 326:
If anyone can provide the missing information, please contact the administrator of Tekwiki.
If anyone can provide the missing information, please contact the administrator of Tekwiki.


Engineering Evaluation (Evaluation of new designs and engineering help) was located in Sunset North (45.5090  -122.7749) (Building 86).  
Engineering Evaluation (Evaluation of new designs and engineering help)  
Building 86 was about 100 feet north of Building 81 and is partially visible in the above photo  
 
was located in Sunset North (45.5090  -122.7749) ([[Building 86]]).  
[[Building 86]] was about 100 feet north of [[Building 81]] and is partially visible in the above photo  
to the right of the Building 81 corner entrance.  
to the right of the Building 81 corner entrance.  
At the time, CRT Engineering was likely also in Building 86.
At the time, CRT Engineering was likely also in [[Building 86]].


In about 1965 [[Wim Velsink]] suggested the formation of an Advanced Development group  
In about 1965 [[Wim Velsink]] suggested the formation of an Advanced Development group  
Line 354: Line 355:
Others
Others




[[Norm Winningstad]] might have been in Sampling at that time, but not in a design capacity
[[Norm Winningstad]] might have been in Sampling at that time, but not in a design capacity


[[Cliff Moulton]] had left in 1962 or early 1963.
[[Cliff Moulton]] had left in 1962 or early 1963.