33,151
edits
mNo edit summary |
No edit summary |
||
Line 24: | Line 24: | ||
Project manager of the 11400 series was [[Tom Rousseau]], who was also project manager for the [[7854]]. | Project manager of the 11400 series was [[Tom Rousseau]], who was also project manager for the [[7854]]. | ||
The 11400 engineering team included some of the main people from the [[7854]] project. | The 11400 engineering team included some of the main people from the [[7854]] project. | ||
The assistant project manager and person responsible for the touch panel and display was [[Murlan Kaufman]]. | |||
<!-- Using random equivalent time sampling, it can acquire up to eight channels at 300 MHz, six channels at 600 MHz, or up to 3 channels at 1 GHz. --> | <!-- Using random equivalent time sampling, it can acquire up to eight channels at 300 MHz, six channels at 600 MHz, or up to 3 channels at 1 GHz. --> |