7B85: Difference between revisions

no edit summary
No edit summary
No edit summary
(10 intermediate revisions by 2 users not shown)
Line 3: Line 3:
|series=7000-series scopes
|series=7000-series scopes
|type=7B85  
|type=7B85  
|summary=400 MHz Delaying Timebase
|summary=400 MHz delaying timebase
|image=Tek 7b85 front.jpg  
|image=Tek 7b85 front.jpg  
|caption=Tektronix 7B85 Delaying Timebase plug-in
|caption=Tektronix 7B85 Delaying Timebase plug-in
|introduced=1976  
|introduced=1976  
|discontinued=1990  
|discontinued=1990  
|designers=Art Metz
|designers=Les Larson;Bruce Hofer;Paul Farley;Art Metz;
|manuals=
|manuals=
* [[Media:070-1960-00.pdf|7B85 Operator's Manual]] (OCR)
* [[Media:070-1960-00.pdf|7B85 Operator's Manual]] (OCR)
Line 15: Line 15:


<small>
<small>
* [http://bama.edebris.com/download/tek/7b85/Tektronix-7B85%20Delaying%20Time%20Base.pdf 070-1961-01 Alternate copy @ BAMA]
* [https://bama.edebris.com/download/tek/7b85/Tektronix-7B85%20Delaying%20Time%20Base.pdf 070-1961-01 Alternate copy @ BAMA]
</small>
</small>
}}
}}
Line 23: Line 23:


The [[7B85]]/[[7B80]] combination was introduced in 1976 to replace the 200 MHz [[7B71]]/[[7B70]] that had no digital delay read-out.  For the [[7104]] 1 GHz-class scopes, the [[7B15]]/[[7B10]] provide the functionality of 7B85/7B80.
The [[7B85]]/[[7B80]] combination was introduced in 1976 to replace the 200 MHz [[7B71]]/[[7B70]] that had no digital delay read-out.  For the [[7104]] 1 GHz-class scopes, the [[7B15]]/[[7B10]] provide the functionality of 7B85/7B80.
From Tekscope Vol.8 No.1, 1976:
<blockquote>
[[Les Larson]] developed the trigger circuitry and served as Project Manager for the 7B80 and 7B85.
The sweeps were designed by [[Bruce Hofer]] and the DVM and related logic by [[Paul Farley]]. Much credit is due [[Art Metz]] for his work on the trigger input IC which includes the peak-to-peak automatic trigger circuitry.
[[Gene Andrews]], Program Manager, provided overall direction for the project.
</blockquote>


{{BeginSpecs}}
{{BeginSpecs}}
{{Spec | Sweep | 5 s/Div to 10 ns/Div in 1-2-5 sequence, &times;10 magnifier down to 1 ns/Div, variable to &times;2.5}}
{{Spec | Sweep | 5 s/div to 10 ns/iv in 1−2−5 sequence, ×10 magnifier down to 1 ns/div, variable to ×2.5}}
{{Spec |Triggering | to 400 MHz }}
{{Spec |Triggering | to 400 MHz }}
{{Spec | Features |  
{{Spec | Features |  
Line 33: Line 40:
}}
}}
{{EndSpecs}}
{{EndSpecs}}
==Links==
* [[Patent US 4109182A]], ''Delayed sweep system for an oscilloscope''.
* [https://m.youtube.com/watch?v=Hz-gF_XSj9w Demonstration of delay and delta time measurement on a 7B85]
{{Documents|Link=7B85}}


==Internals==
==Internals==
The 7B85 uses a [[155-0185-00]] digital voltmeter IC (U686).
The 7B85 uses a [[155-0185-00]] digital voltmeter IC (U686).  
A ramp generator is started when the trigger signal arrives.
A ramp generator is started when the trigger signal arrives.
The delayed sweep is started when a comparator detects that the ramp has reached a  
The delayed sweep is started when a comparator detects that the ramp has reached a control voltage, set by the front panel knobs on the 7B85.
control voltage, set by the front panel knobs on the 7B85.
The control voltage is proportional to the amount of delay.
The control voltage is proportional to the amount of delay.


The digital voltmeter in the 7B85 digitizes the control voltage and displays it  
The digital voltmeter in the 7B85 digitizes the control voltage and displays it on the [[7000 series readout system|oscilloscope readout]], thereby providing the operator with a precise readout of the delay.
on the [[7000 series readout system|oscilloscope readout]], thereby providing the
operator with a precise readout of the delay.


Another way of setting up a precisely delayed timebase is to use a [[7D11]] digital delay module,
Another way of setting up a precisely delayed timebase is to use a [[7D11]] digital delay module.
or even a time mark generator such as the [[180A]], [[181]], [[184]], or [[2901]].


The 7B85 uses the +50 V supply provided by the mainframe.
The 7B85 uses the +50 V supply provided by the mainframe.
==Links==
* [[Media:Tekscope_1976_V8_N1.pdf|Delta time measurement for the 7000 series.  Tekscope Vol.8 No.1, 1976]]
* [https://m.youtube.com/watch?v=Hz-gF_XSj9w Demonstration of delay and delta time measurement on a 7B85]


==Prices==
==Prices==
Line 71: Line 75:
|align=right| $2,400
|align=right| $2,400
|-
|-
! In 2021 Dollars
! In 2023 Dollars
|align=right| $4,100
|align=right| $4,500
|align=right| $4,000
|align=right| $4,500
|align=right| $4,500
|align=right| $4,700
|align=right| $5,000
|align=right| $5,100
|align=right| $5,200
|align=right| $5,600
|-
|-
|}
|}
Line 108: Line 112:
</gallery>  
</gallery>  


{{Custom ICs|7B85}}
==Components==
{{Parts|7B85}}




[[Category:7000 series horizontal plugins]]
[[Category:7000 series horizontal plugins]]