Lang Hedrick: Difference between revisions

From TekWiki
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 1: Line 1:
Lang Hedrick took over a lot of engineering support functions such as the switch design
{{Person
group. He was adamant that engineers should delegate as much of their design work as possible to the engineering support people.
|Names=Lang Hedrick
|Affiliations=Tektronix
}}
took over a lot of engineering support functions such as the switch design group.  
He was adamant that engineers should delegate as much of their design work as possible to the engineering support people.


In 1957 or 1958 Hedrick was leading a project to make a very high voltage (hundreds of volts or possibly a kilovolt) step generator for
In 1957 or 1958 Hedrick was leading a project to make a very high voltage (hundreds of volts or possibly a kilovolt) step generator for
testing attenuators and probes.  
testing attenuators and probes. This instrument made use of hydrogen thyratrons. It was built and used internally for testing attenuators.
This instrument made use of hydrogen thyratrons.
 
It was built and used internally for testing attenuators.
{{MissingBio}}
 
{{Documents|Author=Lang Hedrick}}
{{Designer|LanG Hedrick}}
{{Patents|Lang Hedrick}}


[[Category:Tektronix people]]
[[Category:Tektronix people]]

Latest revision as of 05:01, 30 July 2024

Lang Hedrick (? – ?) took over a lot of engineering support functions such as the switch design group. He was adamant that engineers should delegate as much of their design work as possible to the engineering support people.

In 1957 or 1958 Hedrick was leading a project to make a very high voltage (hundreds of volts or possibly a kilovolt) step generator for testing attenuators and probes. This instrument made use of hydrogen thyratrons. It was built and used internally for testing attenuators.

   Please add referenced biography.

Documents Authored by Lang Hedrick

Products by LanG Hedrick

Components by LanG Hedrick

Patents by Lang Hedrick