39,728
edits
(cat) |
(link) |
||
Line 99: | Line 99: | ||
Early 519's in the '61-'66 period were calibrated in Plant 2 in a group managed | Early 519's in the '61-'66 period were calibrated in Plant 2 in a group managed | ||
by Bob Randall. Three of the men calibrating 519's in that period were | by Bob Randall. Three of the men calibrating 519's in that period were | ||
Stan Griffiths, Dick Bellamy, and John A. (What is John's last name?) | [[Stan Griffiths]], [[Dick Bellamy]], and John A. (What is John's last name?) | ||
During this period, Cliff Moulton would visit the calibration operation to answer | During this period, Cliff Moulton would visit the calibration operation to answer | ||
any questions that would arise as the scopes were being prepared for shipment | any questions that would arise as the scopes were being prepared for shipment |