39,721
edits
No edit summary |
No edit summary |
||
Line 38: | Line 38: | ||
The latch plugs in between the P6451 probes and the 7D01's inputs, and receives the sample clock from the 7D01's Store Clock output. | The latch plugs in between the P6451 probes and the 7D01's inputs, and receives the sample clock from the 7D01's Store Clock output. | ||
Project manager for the 7D01 was [[Murlan Kaufman]]. Project leader was [[Keith Taylor]], with [[Morris Green]] and [[Jeff Bradford]] doing electrical design, and [[Ed Wolf]] mechanical design. [[ | Project manager for the 7D01 was [[Murlan Kaufman]]. Project leader was [[Keith Taylor]], with [[Morris Green]] and [[Jeff Bradford]] doing electrical design, and [[Ed Wolf]] mechanical design. [[Wendell Damm]] worked on the active probe. | ||
{{BeginSpecs}} | {{BeginSpecs}} |