7B85: Difference between revisions

No change in size ,  29 December 2023
m
Fixed OCR error
No edit summary
m (Fixed OCR error)
Line 27: Line 27:
<blockquote>
<blockquote>
[[Les Larson]] developed the trigger circuitry and served as Project Manager for the 7B80 and 7B85.  
[[Les Larson]] developed the trigger circuitry and served as Project Manager for the 7B80 and 7B85.  
The sweeps were designed by [[Bruce Hofer]] and the DVM and related logic by [[Paul Farley]]. Much credit is due [[Art Metz]] for his work on the trigger input 1C which includes the peak-to-peak automatic trigger circuitry.  
The sweeps were designed by [[Bruce Hofer]] and the DVM and related logic by [[Paul Farley]]. Much credit is due [[Art Metz]] for his work on the trigger input IC which includes the peak-to-peak automatic trigger circuitry.  
[[Gene Andrews]], Program Manager, provided overall direction for the project.
[[Gene Andrews]], Program Manager, provided overall direction for the project.
</blockquote>
</blockquote>