7D01: Difference between revisions

No change in size ,  13 June 2023
no edit summary
No edit summary
No edit summary
Line 38: Line 38:
The latch plugs in between the P6451 probes and the 7D01's inputs, and receives the sample clock from the 7D01's Store Clock output.  
The latch plugs in between the P6451 probes and the 7D01's inputs, and receives the sample clock from the 7D01's Store Clock output.  


Project manager for the 7D01 was [[Murlan Kaufman]].  Project leader was [[Keith Taylor]], with [[Morris Green]] and [[Jeff Bradford]] doing electrical design, and [[Ed Wolf]] mechanical design. [[Vendell Damm]] worked on the active probe.
Project manager for the 7D01 was [[Murlan Kaufman]].  Project leader was [[Keith Taylor]], with [[Morris Green]] and [[Jeff Bradford]] doing electrical design, and [[Ed Wolf]] mechanical design. [[Wendell Damm]] worked on the active probe.


{{BeginSpecs}}
{{BeginSpecs}}