S-1: Difference between revisions

Jump to navigation Jump to search
37 bytes added ,  28 March 2020
no edit summary
(Added a link to the factory calibration procedure.)
No edit summary
Line 41: Line 41:
</blockquote>
</blockquote>


The sampling bridge strobe signal is generated by an [[avalanche transistor]] followed by a [[step recovery diode]].
The sampling bridge strobe signal is generated by an [[avalanche transistor]] followed by a [[step recovery diode]], called snap-off diode in Tek lingo.
 


==Pictures==
==Pictures==
1,877

edits

Navigation menu