39,721
edits
No edit summary |
(Designers according to Tekscope V8 N2, 1976) |
||
Line 8: | Line 8: | ||
|introduced=1976 | |introduced=1976 | ||
|discontinued=1985 | |discontinued=1985 | ||
|designers=Murlan Kaufman;Keith Taylor;Morris Green;Jeff Bradford;Ed Wolf;Vendell Damm | |||
|manuals= | |manuals= | ||
* [[Media:070-2205-02.pdf|7D01 Operators Manual]] (OCR) | * [[Media:070-2205-02.pdf|7D01 Operators Manual]] (OCR) | ||
Line 36: | Line 37: | ||
The latch plugs in between the P6451 probes and the 7D01's inputs, and receives the sample clock from the 7D01's Store Clock output. | The latch plugs in between the P6451 probes and the 7D01's inputs, and receives the sample clock from the 7D01's Store Clock output. | ||
Project manager for the 7D01 was [[Murlan Kaufman]]. | Project manager for the 7D01 was [[Murlan Kaufman]]. Project leader was [[Keith Taylor]], with [[Morris Green]] and [[Jeff Bradford]] doing electrical design, and [[Ed Wolf]] mechanical design. [[Vendell Damm]] worked on the active probe. | ||
{{BeginSpecs}} | {{BeginSpecs}} |