7D01: Difference between revisions

274 bytes added ,  27 February 2022
Designers according to Tekscope V8 N2, 1976
No edit summary
(Designers according to Tekscope V8 N2, 1976)
Line 8: Line 8:
|introduced=1976  
|introduced=1976  
|discontinued=1985
|discontinued=1985
|designers=Murlan Kaufman;Keith Taylor;Morris Green;Jeff Bradford;Ed Wolf;Vendell Damm
|manuals=
|manuals=
* [[Media:070-2205-02.pdf|7D01 Operators Manual]] (OCR)
* [[Media:070-2205-02.pdf|7D01 Operators Manual]] (OCR)
Line 36: Line 37:
The latch plugs in between the P6451 probes and the 7D01's inputs, and receives the sample clock from the 7D01's Store Clock output.  
The latch plugs in between the P6451 probes and the 7D01's inputs, and receives the sample clock from the 7D01's Store Clock output.  


Project manager for the 7D01 was [[Murlan Kaufman]].
Project manager for the 7D01 was [[Murlan Kaufman]].  Project leader was [[Keith Taylor]], with [[Morris Green]] and [[Jeff Bradford]] doing electrical design, and [[Ed Wolf]] mechanical design. [[Vendell Damm]] worked on the active probe.


{{BeginSpecs}}
{{BeginSpecs}}