7623: Difference between revisions

Jump to navigation Jump to search
no edit summary
No edit summary
No edit summary
Line 50: Line 50:
Project Engineer for the [[7613]] and 7623 was [[Bill DeVey]] under direction of [[Oliver Dalton]].  
Project Engineer for the [[7613]] and 7623 was [[Bill DeVey]] under direction of [[Oliver Dalton]].  
[[John Durecka]] did the electrical design. [[Doug Giesbers]], [[Ed Wolf]], and [[Chuck Davis]] provided the mechanical design.  
[[John Durecka]] did the electrical design. [[Doug Giesbers]], [[Ed Wolf]], and [[Chuck Davis]] provided the mechanical design.  
The [[T7410|CRT for the 7623]] was developed by [[Gary Siewell]], [[Chris Curtin]], and [[Wes Hayward]].
Aiding the overall design effort were [[Dave McCullough]] and [[Dick Anderson]].  
Aiding the overall design effort were [[Dave McCullough]] and [[Dick Anderson]].  


Navigation menu