R7103: Difference between revisions
mNo edit summary |
(new in 1985 catalog) |
||
Line 5: | Line 5: | ||
|image=R7103 full-front-running.jpg | |image=R7103 full-front-running.jpg | ||
|caption=Tektronix R7103 | |caption=Tektronix R7103 | ||
|introduced= | |introduced=1985 | ||
|discontinued=1990 | |discontinued=1990 | ||
|summary=1 GHz non-storage mainframe | |summary=1 GHz non-storage mainframe | ||
Line 19: | Line 19: | ||
Many R7103s were used in nuclear instrumentation, i.a. because | Many R7103s were used in nuclear instrumentation, i.a. because | ||
<blockquote> | <blockquote> | ||
''[The MCP] provides a gain in waveform brightness of several thousands. This level of brightness allows for a selection of film-processing combinations that are highly resistant to unwanted radiation.''<ref>https://www.osti.gov/servlets/purl/6731423 | ''[...] Waveforms as fast as 1 ns per division can now be recorded on high-quality films substantially resistant to unwanted radiation exposure.'' | ||
''[... The MCP] provides a gain in waveform brightness of several thousands. This level of brightness allows for a selection of film-processing combinations that are highly resistant to unwanted radiation.''<ref>https://www.osti.gov/servlets/purl/6731423 ''Oscilloscope Photography at Nevada Test Site (1990)''</ref> | |||
</blockquote> | </blockquote> | ||
Line 34: | Line 36: | ||
==Links== | ==Links== | ||
* [https://www.eevblog.com/forum/reviews/tektronix-r7103-scope-teardown/ R7103 "teardown" with lots of internal pictures] | * [https://www.eevblog.com/forum/reviews/tektronix-r7103-scope-teardown/ R7103 "teardown" with lots of internal pictures] | ||
==Prices== | |||
<!-- http://www.usinflationcalculator.com/ --> | |||
{| class="wikitable" | |||
|- | |||
! | |||
! Year | |||
! 1985 | |||
! 1990 | |||
|- | |||
!rowspan=2| Mainframe only | |||
! Catalog price | |||
|align=right| $22,920 | |||
|align=right| $30,200 | |||
|- | |||
! In 2022 Dollars | |||
|align=right| $61,200 | |||
|align=right| $66,400 | |||
|- | |||
!rowspan=2| Mainframe with<br />[[7A29]] and [[7B10]] | |||
! Catalog price | |||
|align=right| $28,155 | |||
|align=right| $37,075 | |||
|- | |||
! In 2022 Dollars | |||
|align=right| $75,200 | |||
|align=right| $81,600 | |||
|- | |||
|} | |||
==Pictures== | ==Pictures== | ||
Line 57: | Line 88: | ||
<blockquote> | <blockquote> | ||
''"MIGHTY OAK was conducted on April 10, 1986, below the surface of Rainier Mesa in the T-tunnel complex. Containment of MIGHTY OAK was satisfactory in that there was no accidental release of radioactivity to the atmosphere whatsoever. However, the tunnel grout in the near-cavity region was not sufficiently constrained. Failure of this plug led to the subsequent failure of the mechanical closure systems and to the eventual flow of cavity gas, plug material, and other debris down the line-of-sight (LOS) pipe to the experiment chamber and the tunnel complex beyond."'' | ''"MIGHTY OAK was conducted on April 10, 1986, below the surface of Rainier Mesa in the T-tunnel complex. Containment of MIGHTY OAK was satisfactory in that there was no accidental release of radioactivity to the atmosphere whatsoever. However, the tunnel grout in the near-cavity region was not sufficiently constrained. Failure of this plug led to the subsequent failure of the mechanical closure systems and to the eventual flow of cavity gas, plug material, and other debris down the line-of-sight (LOS) pipe to the experiment chamber and the tunnel complex beyond."'' | ||
<ref>https://www.osti.gov/servlets/purl/5363382</ref> | <ref>https://www.osti.gov/servlets/purl/5363382 ''Mighty Oak Containment Review'' (1989)</ref> | ||
</blockquote> | </blockquote> | ||
Line 63: | Line 94: | ||
<blockquote> | <blockquote> | ||
''"All of the diagnostic equipment, and much of the construction equipment in the tunnel complex were lost as a result of heat damage and radiation contamination. At present, the loss of normally recoverable and reusable equipment is reported at approximately 32 million dollars."''<ref>https://www.osti.gov/servlets/purl/6607938</ref> | ''"All of the diagnostic equipment, and much of the construction equipment in the tunnel complex were lost as a result of heat damage and radiation contamination. At present, the loss of normally recoverable and reusable equipment is reported at approximately 32 million dollars."''<ref>https://www.osti.gov/servlets/purl/6607938 ''Containment and Safety Review for the Mighty Oak Nuclear Weapon Effects Test'' (1987)</ref> | ||
</blockquote> | </blockquote> | ||
($32M in 1986 is almost $84M in 2022 Dollars.) | ($32M in 1986 is almost $84M in 2022 Dollars.) | ||
Line 70: | Line 101: | ||
434-SAN-A851203.jpg | Tek R7103s in instrumentation racks for the Mighty Oak nuclear test | 434-SAN-A851203.jpg | Tek R7103s in instrumentation racks for the Mighty Oak nuclear test | ||
434-SAN-A860266.jpg | | 434-SAN-A860266.jpg | | ||
434-SAN-A860535.jpg | 434-SAN-A860535.jpg | | ||
434-SAN-A861300.jpg | Tektronix R7103 oscilloscopes destroyed in the Mighty Oak nuclear test | 434-SAN-A861300.jpg | Tektronix R7103 oscilloscopes destroyed in the Mighty Oak nuclear test | ||
</gallery> | </gallery> |
Revision as of 14:42, 22 April 2022
The Tektronix R7103 is a 1 GHz mainframe, the rack-mount version of the 7104. It takes 7000-series plug-ins, two vertical and one horizontal.
The scope employs a micro-channel plate CRT design to get good screen intensity at high sweep speeds with moderate acceleration voltage.
Many R7103s were used in nuclear instrumentation, i.a. because
[...] Waveforms as fast as 1 ns per division can now be recorded on high-quality films substantially resistant to unwanted radiation exposure.
[... The MCP] provides a gain in waveform brightness of several thousands. This level of brightness allows for a selection of film-processing combinations that are highly resistant to unwanted radiation.[1]
Key Specifications
Bandwidth | 1 GHz (with 7A29) — rise time < 350 ps |
---|---|
Fastest calibrated sweep | 200 ps/Div (with 7B10) |
Features |
|
Links
Prices
Year | 1985 | 1990 | |
---|---|---|---|
Mainframe only | Catalog price | $22,920 | $30,200 |
In 2022 Dollars | $61,200 | $66,400 | |
Mainframe with 7A29 and 7B10 |
Catalog price | $28,155 | $37,075 |
In 2022 Dollars | $75,200 | $81,600 |
Pictures
-
-
-
-
-
-
-
Channel switch
-
-
-
-
-
-
-
Mighty Oak Nuclear Test Incident
"MIGHTY OAK was conducted on April 10, 1986, below the surface of Rainier Mesa in the T-tunnel complex. Containment of MIGHTY OAK was satisfactory in that there was no accidental release of radioactivity to the atmosphere whatsoever. However, the tunnel grout in the near-cavity region was not sufficiently constrained. Failure of this plug led to the subsequent failure of the mechanical closure systems and to the eventual flow of cavity gas, plug material, and other debris down the line-of-sight (LOS) pipe to the experiment chamber and the tunnel complex beyond." [2]
The Mighty Oak containment failure in the tunnel reportedly destroyed 100+ oscilloscopes.
"All of the diagnostic equipment, and much of the construction equipment in the tunnel complex were lost as a result of heat damage and radiation contamination. At present, the loss of normally recoverable and reusable equipment is reported at approximately 32 million dollars."[3]
($32M in 1986 is almost $84M in 2022 Dollars.)
-
Tek R7103s in instrumentation racks for the Mighty Oak nuclear test
-
-
-
Tektronix R7103 oscilloscopes destroyed in the Mighty Oak nuclear test
References
- ↑ https://www.osti.gov/servlets/purl/6731423 Oscilloscope Photography at Nevada Test Site (1990)
- ↑ https://www.osti.gov/servlets/purl/5363382 Mighty Oak Containment Review (1989)
- ↑ https://www.osti.gov/servlets/purl/6607938 Containment and Safety Review for the Mighty Oak Nuclear Weapon Effects Test (1987)
CRTs used in the R7103
Page | Part nos | Description | Designers | Used in |
---|---|---|---|---|
T7100 | 154-0783-00 | micro-channel plate CRT | Dennis Hall • Aris Silzars • Conrad Odenthal | 7104 • R7103 |
T7101 | micro-channel plate CRT | 7104 • R7103 |